
Project Gemini Flight Readiness Report
Description
Project Gemini Flight Readiness Review Report
(1966, approx. 200pp., McDonnell Aircraft Report FRR-8, soft cover, stapled.) This report outlines the flight readiness of Gemini Spacecraft 8, covering the period from delivery at the Cape through the joint combined systems test. Cover shows slight coloration from age, but document in overall good condition. A fascinating look at the quality control report for this Titan. Seldom seen. From the personal collection of and signed on the cover page by Astronaut David Scott.
(1966, approx. 200pp., McDonnell Aircraft Report FRR-8, soft cover, stapled.) This report outlines the flight readiness of Gemini Spacecraft 8, covering the period from delivery at the Cape through the joint combined systems test. Cover shows slight coloration from age, but document in overall good condition. A fascinating look at the quality control report for this Titan. Seldom seen. From the personal collection of and signed on the cover page by Astronaut David Scott.
Buyer's Premium
20%
Project Gemini Flight Readiness Report
Estimate $150-$250
TOP













