Sold2022DIAMOND NECKLACEDIAMOND NECKLACE Containing 98 round brilliant cut diamonds weighing approximately 30.00 carats total. Mounted in platinum. 20 inches long. Stamp: MIR PLAT. Gross weight: 34.00 dwt.See Sold Price
Sold2022Henry Dunay 18K Gold and Platinum Necklace18 karat yellow gold Opera length necklace with 0.950 platinum accents marked by Henry Dunay, contemporary. Necklace is 32" long (opera length), and is made up of a chain with round links (rolo / rollSee Sold Price
Sold2022Henry Dunay 18K Gold and Platinum Necklace18 karat yellow gold Opera length necklace with 0.950 platinum accents marked by Henry Dunay, contemporary. Necklace is 32" long (opera length), and is made up of a chain with round links (rolo / rollSee Sold Price
Sold2022WHITE GOLD AND DIAMOND NECKLACEWHITE GOLD AND DIAMOND NECKLACE Containing 83 round brilliant cut diamonds weighing approximately 7.95 carats total. 32 inches long. Clasp stamp: 18K. Gross weight: 13.40 dwt.See Sold Price
Sold2022BULGARI Elegant white gold Truss Ring signed "Bulgari" with white oval central diamond 1.42 carats.Elegant white gold Truss Ring signed "Bulgari" with white round central diamond 1.42 carats. . . . Gross weight gr.7,98See Sold Price
Sold2021A diamond and eighteen karat white gold necklaceA diamond and eighteen karat white gold necklace designed as a long chain set throughout with round brilliant-cut diamonds; estimated total diamond weight: 32.60 carats. (32.3 dwt.; Length: 33 3/4 in.See Sold Price
Sold2021TIFFANY & CO., YELLOW GOLD AND DIAMOND 'VANNERIE'TIFFANY & CO., YELLOW GOLD AND DIAMOND 'VANNERIE' BRACELET Containing 38 round brilliant cut diamonds weighing approximately 1.70 carats total. 7 inches long. Stamp: Tiffany & Co. 750 1985. 32.70 dwt.See Sold Price
Sold2022LONG SCROLL OF CHINESE PAINTING AND CALLIGRAPHYLONG SCROLL OF CHINESE PAINTING AND CALLIGRAPHY; L. 500 cm. W. 32 cm.See Sold Price
Sold2018Long Diamond NecklaceLong Diamond Necklace 18k white gold, the necklace mounted with round brilliant-cut diamonds weighing approximately 9.31 carats in total, approximate color E-F and clarity VS1-VS2. l. 32-1/2", total wSee Sold Price
Sold2022Diamond Pendant with 3.10 Carat Round Brilliant,surrounded by 32 round diamonds totaling an additional .32 carat, 14K white gold, with appraisal of $26,500.00.See Sold Price
2023Certified 3.2 ctw Diamond Ring - 14K White Gold"Description: 3 carat emerald cut diamond in center with 0.2 carat total small round cut diamonds in shoulders. All set in 14k white gold. Suggested Retail Price: $64.500 Item: Diamond Ring TotalSee Sold Price
Sold2023Certified 3.2 ctw Diamond Ring - 14K White Gold"Description: 3 carat emerald cut diamond in center with 0.2 carat total small round cut diamonds in shoulders. All set in 14k white gold. Suggested Retail Price: $64.500 Item: Diamond Ring TotalSee Sold Price
2023Certified 3.2 ctw Diamond Ring - 14K White Gold"Description: 3 carat emerald cut diamond in center with 0.2 carat total small round cut diamonds in shoulders. All set in 14k white gold. Suggested Retail Price: $64.500 Item: Diamond Ring TotalSee Sold Price
Sold202432.49ctw Diamond And Platinum Tennis Necklace32.49ctw Diamond And Platinum Tennis Necklace, 95 G-I, SI2-I2 Round Brilliant Cut Diamonds (32.49ctw) Comprise This Diamond And Platinum Tennis Necklace. 17.5 Inches Long; 58.4g. See Last Photo For ApSee Sold Price
Sold2024Tiffany & Co Victoria Tennis Bracelet Platinum with diamondsTiffany & Co Victoria Tennis Bracelet Platinum with diamonds 7" long Marquise diamonds, carat total weight .18 Round brilliant diamonds, carat total weight 2.90 RETAIL: $21,500See Sold Price
Sold2022DIAMOND BRACELETDIAMOND BRACELET Containing 32 marquise and 51 round brilliant cut diamonds weighing approximately 10.15 carats total. Mounted in white gold. 7 1/4 inches long. Stamp: (maker's mark) 750. Gross weightSee Sold Price
Sold2022YELLOW GOLD, WHITE CORAL AND DIAMOND BRACELETYELLOW GOLD, WHITE CORAL AND DIAMOND BRACELET Containing 16 carved white coral plaques and 32 round brilliant cut diamonds weighing approximately 0.25 carat total. 7 inches long. Stamp: 18K. Gross weiSee Sold Price
Sold2023CY TWOMBLY Natural History, Part I, Mushrooms: No. IV.Natural History, Part I, Mushrooms: No. IV. 1974. Lithograph. Cm 55,50 x 75,50. 32/98, Edition and signature lower right in pencil. Mattieu Litho, Switzerland, dry stamp lower left. Sheet from a foldeSee Sold Price
Sold2022An Impressive 13.50 ctw Diamond Tennis BraceletPlatinum tennis bracelet featuring 32 round brilliant-cut diamonds, weighing approx. 13.50 ctw, approx. 0.41-0.43 ct each, average E-F color, average VS-SI clarity, hidden box clasp with snap under saSee Sold Price
Sold2019Audemars Piguet, 18K Yellow Gold and Diamond 'RoyalAudemars Piguet, 18K Yellow Gold and Diamond 'Royal Oak' Wristwatch No. 1489, the bezel containing 32 round brilliant cut diamonds weighing approximately 0.96 carat total, 34.00 mm case diameter, chamSee Sold Price
Sold2024Leather loveseat, excellent quality, no tears, loveseat is 54" long, 32" deep, height is 27", seatLeather loveseat, excellent quality, no tears, loveseat is 54" long, 32" deep, height is 27", seat height is 16"See Sold Price
Sold2022YELLOW GOLD BELTYELLOW GOLD BELT Consisting of a textured mesh link belt measuring approximately 14.50 mm wide. 28-32 inches long. Stamp: Kt18 ITALY. Gross weight: 147.10 dwt.See Sold Price
Sold2022AN 18K WHITE GOLD AND DIAMOND LONG CHAINAN 18K WHITE GOLD AND DIAMOND LONG CHAIN Featuring round diamonds weighing approximately 34.00 carats, measures 60 in.See Sold Price
Sold2022Paul Evans, Wavy Front cabinetPaul Evans Wavy Front cabinet Paul Evans StudioUSA, 1973welded, gilt, polychromed and patinated steel 32.5 h × 98.75 w × 22.75 d in (83 × 251 × 58 cm) Cabinet feaSee Sold Price
Featured5 days LeftCharleston Estate Services Ltd.LADIES ESTATE 14K BLUE TOPAZ 12.36 CARAT DIAMOND RINGUS$350(4 bids)
6 days Left3 Kings Auction28.67 ctw Princess Cut Diamond Micro Pave Necklace 18K Yellow GoldUS$25,750
36 mins LeftFederal Assets AuctioneersAntique 18k Gold 3.24 ctw Old Cut Diamond & Emerald Ribbon Dual Dress Clip BroocUS$1
36 mins LeftFederal Assets AuctioneersLarge 18k Yellow Gold Moissanite & Emerald Ring by Carlo RiciUS$1(1 bid)