Sold2019FRAMED BROOKLINE & PEPPERELL RAILROADOPENING DAY SOUVENIR WOVEN RIBBON SEPTEMBER 8, 1892, HAS FRAYING AT TOP & BOTTOM OF RIBBON - GOOD & BOSTON & ALBANY RAILROAD TIME TABLE FOR CAMP MEETING AT SPRINGFIELD, SUNDAY, AUG. 30TH, 1868 WITH STSee Sold Price
Sold2016Framed Boston & Albany Depot TimetableA fine depot framed timetable from the Boston & Albany Railroad. This type of their ads are sometimes dated and sometimes not. This one does not have a date but I have seen them from the 1870s. The frSee Sold Price
Sold2017Framed Concord Railroad Loco "General John Stark"A nice photograph of the General John Stark at the Concord, New Hampshire roundhouse of the Concord Railroad. Note the rou8ndhouse door numbers. The frame measures 22" by 19". The print measures 14 1/See Sold Price
Sold2021Catskill, Tannersville & Otis Timetable 1909 FramedA framed timetable from the Dale Flansburg collection. It measures 21" x 16". The frame is a modern era item and the timetable has been matted. It features the Catskill & Tannersville Railroad and theSee Sold Price
Sold2024Androscoggin Railroad 1863 Framed TimetableThe Androscoggin Railroad was one of the original members of the Maine Central Railroad. That too place in 1871. In 1863 this timetable indicates one train each way between Portland and Farmington. ThSee Sold Price
Sold2022Baldwin Builder Photograph CRRofNJ Camelback FramedBaldwin Locomotive Works builder photo of Central Railroad of New Jersey #597 a 4-4-2 (Atlantic type) passenger locomotive. It is a "camelback" style where engineer and fireman are not together behindSee Sold Price
Sold2021Catskill Mountain Railroad Timetable 1909 FramedA framed timetable from the Dale Flansburg collection. It measures 19" x 16". The frame is a modern era item and the timetable has been matted. It also mentions Tannersville and Otis Elevating railwaySee Sold Price
Sold2015* Framed Railroad Photographs (15)A large group of 15 framed photographs. Subjects include Maine Central, Rumford Falls & Buckfield, Old Colony, Central Vermont, Boston & Maine, early Concord funnel stack, B&M notice with marked B&MRRSee Sold Price
Sold2022Lehigh Valley Railroad Framed Advertising LithographCirca 1904 Lehigh Valley Railroad advertising lithograph featuring the "Black Diamond" passenger train. It measures 32" by 22" and it was professionally restored. Very nice.See Sold Price
Sold2021Framed Catskill Mountain Railroad Timetable 1902A professionally framed depot timetabel dated September 11, 1902. This was Catskill Mountian issue #122. It measures 17 1/2" by 14". Excellent condition.See Sold Price
Sold2016Maine Central Railroad Framed Depot TimetableA fine framed Maine Central Railroad depot notice with changes in times for trains between Lewiston and the Rockland Branch to Bath. This 1899 notice pre-dates the Kennebec River bridge so ferries werSee Sold Price
Sold2015Boston & Maine Railroad Photographs (18)A group of about 18 Boston & Maine Railroad related photographs. All are either framed or mounted on cardstock. Some are from B&M predecesssor lines in the 1800s. There is a fine Fitchburg hand car wiSee Sold Price
Sold2024Profile & Franconia Railroad 1890 Notice FramedThe Profile & Franconia Railroad was originally a narrow gauge line that ran from Bethlehem Junction to Profile Mountain is Franconia Notch. This notice was for a change in time for Sunday trains betwSee Sold Price
Sold2018Framed Eastern Railroad Hinkley LocomotiveA framed photograph of Eastern Railroad #74. Notes indicate that this was a Hinkley 4-4-0. Ornate tender and nice details. The frame measures 21" by 12 1/2".See Sold Price
Sold2017Taunton Locomotive Works Photographs - 2Both of these framed photographs are from locomotives built by the Taunton Locomotive Manufacturing Company for the Boston & Providence Railroad. The blue hue I think is called a Cyanotype. Both haveSee Sold Price
Sold2017Framed "Shopmates" 1888 Bradford WreckAn interesting frame that was expertly made from wreckage of car 403 that met its death in the Bradford Massachusetts wreck. The subject is shop mates of the Boston & Maine Railroad. It's an interestiSee Sold Price
Sold2017Boston & Maine Framed Builder Photo #346 4-6-0A Boston & Maine Railroad framed builder photograph of locomotive #346. This was an Alco built 4-6-0 and this number pre-dates the 4 digit renumbering scheme in 1911. The frame measures 33 1/2" by 22"See Sold Price
Sold2017Erie Retirement BofRRT Hand Embroidered FramedA retirement presentation piece that has been framed to a member of post 146 of the Brotherhood or Railroad Trainmen. It also has ERIE spelled out across the bottom. I do not know needle craft but I tSee Sold Price
Sold2017* Union Pacific Railroad Skull Rocks Framed AdThis is an earlier Union Pacific framed photograph from a series of prints that the UP did featuring Western scenes. The frame measures 29" by 26" and it is heavy. Skull Rock(s) is in Wyoming. This phSee Sold Price
Sold2015* Mounted & Framed Railroad Photographs (15)A group of about 15 Boston & Maine Railroad related photographs. All are either framed or mounted on cardstock. Several are from the 1800s. They vary in size and condition. Some have details on the reSee Sold Price
Sold2017* Framed Old Colony Railroad Locomotive #261A large frame photograph of Old Colony Railroad locomotive #261. She was built in 1893. This loco was re-numbered to 163 by the New Haven and she was scrapped in 1923. It had 19x26" cylinders and it hSee Sold Price
Sold2016Wiscasset & Quebec Railroad Timetable #2 1895From the Edaville Museum a some point is Wiscasset & Quebec Railroad Timetable #3 dated May 20, 1895. It is framed and very faded. The frame measures about 10 1/2" by 12". The visible portion of the tSee Sold Price
Sold20172 Pennsylvania Railroad framed NoticesA pair of framed notices from the Pennsylvania Railroad. (1) Trespass - measures 12" by 11" (2) Buffalo Division rules with 2 holes for mounting on wooden surface - measures 10 1/2" by 16".See Sold Price
Sold2018A pair of Framed Schedules Notices G&J C&LA pair of framed items(1) Greenwich & Johnsonville Special train notice to go to and from the races in Saratoga on Aug 22, 1903 - measures 8 1/2" by 19" (2) Chatham & Lebanon Railroad request for 50,0See Sold Price
1 day LeftDenotter Auctions, LLC2 Framed Railroad Locomotive Antique Cabinet Card Photographs. Trains and Conductors$6
May 09Rail & Road AuctionsFramed Railroad Interlocking and Signal Instructions and Circular - Louisville and Nashville and$20
2024Rapid Estate Liquidators and Auction GalleryFramed Linda Hartough AP Litho Brookline Country Golf ClubSee Sold Price
May 09Rail & Road AuctionsFramed 1867 William Mason Cape Cod Central Railroad Highland Light Builders Advertising Lithograph$250
937 Lots AwayMynt Auctions1942 NY Central Railroad-Grand Central Stock Certificate custom framed display$10
May 19Rich Penn AuctionsRailroad Calendar, Missouri Pacific Lines-Route of the Eagles w/interchangeable cdbd days,$50(1 bid)
May 09Rail & Road AuctionsThree Walter L. Green New York Central Framed Advertising Prints - "In The Hudson River Valley" ,$30(1 bid)
May 09Rail & Road AuctionsFour Ben Dedek and Howard Fogg Railroad Advertising Prints - Lehigh Valley, Union Pacific, Monon,$40
May 19The Heritage Gallery at Sayville Antiques, IncUnsigned Modern Image O/B Titled Railroad Watch 1952$50
May 10Rail & Road AuctionsNew York Central Railroad West Shore Western Electric Marine Engine Plates and Stony Point Ferry$30
May 09Rail & Road AuctionsFramed Hinkley & Williams Works Steam Locomotive Advertising Builders Lithograph$150
May 09Rail & Road AuctionsSix Union Pacific and Southern Pacific Railroad Menus - Columbine, Golden State, Palms Orange Groves$20
20 hrs LeftRapid Estate Liquidators and Auction GalleryFramed Karl Karalus Wood Ducks Limited Edition Signed Lithograph$120
20 hrs LeftRapid Estate Liquidators and Auction GalleryFramed Karl Karalus Limited Edition Signed Owl Lithograph$170
2 days LeftRapid Estate Liquidators and Auction GalleryFramed Original Acrylic Karl Karalus Northern Bobwhite$400